ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_115-e / Inbox / Drafts / [Pre115-e][001][MBS] Summary 8.1.2.2 L2 Scheduling and PowSav (Qualcomm)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-2108846_[Pre115-e][001] MBS_8.1.2.2_ Summary of Scheduling and Power saving_v4_final_clean.docx 2021/08/16 4:35 72,3 KB
icon R2-210xxxx_[Pre115-e][001] MBS_8.1.2.2_ Summary of Scheduling and Power saving_v3_QC_Rappo.docx 2021/08/14 1:43 79,3 KB
icon R2-210xxxx_[Pre115-e][001] MBS_8.1.2.2_ Summary of Scheduling and Power saving_v2_Chengdu TD Tech & TD Tech.docx 2021/08/13 7:17 76 KB
icon R2-210xxxx_[Pre115-e][001] MBS_8.1.2.2_ Summary of Scheduling and Power saving_v1_Lenovo.docx 2021/08/11 8:10 75,5 KB
icon R2-210xxxx_[Pre115-e][001] MBS_8.1.2.2_ Summary of Scheduling and Power saving_v1.docx 2021/08/11 3:49 71 KB

5 items.